
10
Steps to Installation
All diagrams and images in this section are for illustrative
purposes only.
Step 1. Electrical Outlet and Rough Plumbing Placement
1) An aerial view of the system appears in Figure 1.1 below. Both electrical outlet and rough
plumbing (One 1/2–inch Hot; One 1/2-inch Cold Drain Connection) need to be placed in
either Range A or B pictured. You may choose A or B depending upon procedure room
constraints. The Exhaust Vent Opening (1 1/2" (3.8 cm) pipe,
See
Step 11
) needs to be
placed in the ceiling above or in the wall beside the tower cabinet depending upon
procedure room constraints and building code requirements.
Manufacturer’s Recommendation:
Bring 1-inch water lines to the procedure room for
optimal water pressure. Connect the 1/2-inch fittings that go to the device to the 1-inch
water lines from the wall.
Summary of Contents for 120G5
Page 4: ......
Page 20: ...16 Figure 5 3 Basin Tower...