background image

7

Operation

Installation - Wall Hanging

Hanging on a wall

Sides

2 in. / 5 cm

Floor

2 in. / 5 cm

Top

24 in. / 60 cm

Bottom

2 in. / 5 cm

WARNING:

 

Keep drapery and other furnishings at least 3 ft / 1 m 

Clearance to combustibles

Min. 5 cm

2 in.

Min. 5 cm

2 in.

Min. 5 cm

2 in.

Min. 60 cm

24 in.

Back

0 in. / 0 cm

Your new electric fireplace may be installed virtually somewhere in your home. However, when choosing a location be sure to follow the  

general instructions included. For best results install out of direct sunlight. Power supply service must be either completed or placed 

within the electric fireplace prior to finishing to avoid reconstruction.

from the front and sides of the electric fireplace.

Summary of Contents for HW93233SMQR

Page 1: ...IMPORTANT SAFETY INFORMATION Always read this manual rst before attempting to install or use this stove For your safety always comply with all warnings and safety instructions contained in this manua...

Page 2: ...dware Included 5 Product S 5 Tools Required 5 Package Contents 6 Installation Options 7 Wall Hanging 8 Fuel Bed Setup Instructions 11 Operation 15 Care Cleaning 18 Troubleshooting 19 Replacement Parts...

Page 3: ...ns Disconnect power at service panel and have heater inspected by a reputable electrician before reusing then remove plug from outlet intakes or exhaust in any manner sparking parts inside Do not use...

Page 4: ...4 Warranty...

Page 5: ...Package Contents lists If any part is missing or damaged do not attempt to assemble install or operate the product Contact customer service for replacement parts EstimatedAssemblyTime 30Minutes Philli...

Page 6: ...t Glass 1 D 1 E 2 G Horizontal Trim Logs Media Varies G J H F Longitudinal Trim 2 K H Screw Set F E I Mounting Bracket bottom Mounting Bracket top I 1 K Remote Control Crystal Media Varies J AAA Batte...

Page 7: ...Min 5 cm 2 in Min 60 cm 24 in Back 0 in 0 cm Your new electric fireplace may be installed virtually somewhere in your home However when choosing a location be sure to follow the general instructions i...

Page 8: ...Operation Installation Wall Mounting A Use the two marked center holes of the Top Mounting Bracket B to measure and locate the hole for the Bottom Bracket A Follow the dimensions in the drawing Mark...

Page 9: ...nging the Fireplace Hang the Fireplace C D on the hook at the top of the Top Mounting Bracket B and let the Fireplace C D sit onto the Bottom Mounting Bracket A Operation Installation Wall Mounting co...

Page 10: ...he Fireplace Secure the fireplace C D to the Bottom Mounting Bracket A with the retaining Screw CC Continue to the fuel bed setup instructions Page 15 Operation Operation Installation Wall Mounting co...

Page 11: ...the Frame D Operation Fuel Bed Setup Instructions C D J Placing the Logs and media pieces Place the Crystal Media Pieces J on the Fuel bed Place the Frame D back on the Fireplace C with the four screw...

Page 12: ...e upper steps to secure all 12 bolts and nuts The Wall Fire provided 2 Frames options it can be Frame option either front glass or Metal Frame the Metal Frame is covering the front glass when it was f...

Page 13: ...on Fireplace Remove 4 screws on the fireplace 2screws on top and 2 on the bottom Operation Metal Frame Setup Instructions Continued Hooking the Metal Frame Put and hook top flange onto the fireplace...

Page 14: ...14 5 Securing the screws onto the Fireplace Secure Removed 4 screws back on the fireplace 2screws on top and 2 on the bottom Operation Metal Frame Setup Instructions Continued...

Page 15: ...n 3 Heater Button 4 Thermostat Down button 4 Thermostat up button 7 Color themes button 4 Thermostat Down button 4 Thermostat up button 2 Flame effect button 3 Heater Button 7 Color themes button 5 Br...

Page 16: ...at is adjustable by 1 F or 1 C increments by pressing the Up or Down buttons on the remote control or buttons on control panel Turns the Heater On and Off actived by pressing the button on the remote...

Page 17: ...th Recycling used materials also conserves natural resources For more information about collecting and recycling used batteries please contact your local municipality your waste disposal service or th...

Page 18: ...ational and local codes If repairing or replacing any electrical component or wiring the original wire routing color coding and securing locations must be followed During any service of this appliance...

Page 19: ...nting heater from turning on Adjust the temperature settings to ensure that the thermostat is set higher than the current room temperature The heater does not work but Power and Heater settings are ON...

Page 20: ...parts call our customer service department at 1 800 986 3460 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday A E F G H I J K L D N M Power Supply Control Circuit Board Thermostat Sensor M Moun...

Reviews: