30
D. Pull the Cable (32) downwards and connect the Cable (32) with the Base Tube (2).
Tighten nut with the 17 mm-19 mm Double Open End Wrench provided.
PLEASE REFER TO THE “CABLE LOOP DIAGRAM” SECTION ON PAGE
41.
Hardware:
STEP 10
Routing the Cable (32) from A to E.
(75) Hexagon Head Bolt
1 PC
(76) Hexagon Head Bolt
2 PCS
(85) Nylon Nut
3 PCS
(87) Flat Washer
4 PCS
(33) Arm Cable
1 PC