28
Step 7
Attach the Pulley (27) onto the Top Frame (8) with one M10x65 Hexagon Head Bolt (24), one
M10 Nylon Lock Nut (58), two Flange Covers (32), and two Ø10 Washers (35). Tighten bolt
and nut with two Wrenches provided.
Connect the Hook (40) to the ball stopper end of the Lat Bar Cable (54) and Lat Bar (9).
Hardware:
Routing the Lat Bar Cable
Insert the cable around the Pulley (27) at the front of the Pulley (27) on the Top Frame (8)
then pull it towards to the second Pulley (27) on the Top Frame (8).
Draw the Lat Bar Cable (54) around the Pulley (27) then pull it downwards to the Double
Floating Pulley Bracket (37). Draw the Lat Bar Cable (54) around the Pulley (27) on the
Double Floating Pulley Bracket (37) then pull it upwards to the third Pulley (27) on the Top
Frame (8). Draw the Lat Bar Cable (54) around the Pulley (27) then pull it downwards to
the Guide Rod (68). Thread the bolt at the end of the Lat Bar Cable (54) into the opening
on top of the Guide Rod (68) to secure the cable. Insert the L-Shaped Pin (61) into the pin
slot.
PLEASE REFER TO THE “CABLE LOOP DIAGRAM” SECTION ON PAGE
21.
58
35
32
35
24
9
40
54
27
32
8
61
64
54
63
2 Wrenches (19-17)
Tool:
1Pulley
1 Hexagon Head Bolt M10x65
2 Washers (Ø10)
1 Nylon Lock Nut (M10)
1 Hook
1 L-Shaped Pin
2 Flange Covers
Summary of Contents for 63140 G5/HOME GYM
Page 9: ...8 OVERVIEW DRAWING ...