7
ASSEMBLY INSTRUCTIONS
1. Install the Front and Rear Stabilizers.
Remove four M10x65 Bolts (11) and Ø10xØ20x2
Washers (12) from the Front and Rear Stabilizers
(3, 2).
Attach the Front Stabilizer (3) onto the front
bracket of the Main Frame (1) with two M10x65
Bolts (11) and Ø10xØ20x2 Washers (12) that were
removed.
Attach the Rear Stabilizer (2) onto the rear bracket
of the Main Frame (1) with two M10x65 Bolts (11)
and Ø10xØ20x2 Washers (12) that were removed.
Turn the Adjustable Leveler (14)
on the underside
of the Front and Rear Stabilizers (3, 2) as needed
to level the bike.
2. Install the Left and Right Pedals.
Connect the Left Pedal (10L) to the Left Crank
(29L). Thread it into the crank assembly in the
counterclockwise direction by the tool provided.
Connect the Right Pedal (10R) to the Right Crank
(29R) by threading it in the clockwise direction.
NOTE:
The Left/Right Pedals (10L, 10R) and
Left/Right Cranks (29L, 29R) are marked with “
L
”
& “
R
” (left and right).
14
11
12
3
11
12
2
1
1
29R
10R
10L
2