Life Optimo OP3 Instructions And Warnings For Installation, Use And Maintenance Download Page 7

4

2.4  Positioning the operator and stop plate adjustment

 

1.    Release the operator as indicated in the RELEASING THE OPERATOR chapter.

2.    Lift the operator and insert the nut screw bushing support pin (3) into the hole on the front bracket (2).

3.    Insert the bushing 

       bushing. Fix the whole set with a screw, washer and self-locking nut and tighten.

4.    Fix the operator to the front bracket (2) using a screw and washer, and tighten.

5.    Manually open and 

       to the gate’s plane of movement.

6.    Check that the nut s

       5 mm between the nut screw bushing support (3) and the closure (6) and opening (7) stop plates.

7.    If necessary, use a different hole on the rear bracket and repeat the operations indicated in points 3 and 4. .

8.    Define with precision the opening and closure positions of the stop plates on the operator’s internal slider, as follows: 

•      take the gate to a closed position, abutting against the stop plate.

•      loosen the suppor

       lock again by tightening.

•      Take the gate leaf to the desired opening position; 

•      loosen the suppor

       lock again by tightening.

9.    Definitively fix the front bracket (2) of the operator, to the leaf of the gate, choosing the clamping means to suit the material of the leaf (with screws 

       or by welding).

10.  Release the operator as indicated in the RELEASING THE OPERATOR chapter.

2.5 Releasing the operator

ATTENTION:

•       

The fitter must permanently fix the label describing the manual release operation close to the manual release key.

•  

         mechanical unbalance conditions.

•        Before performing the manoeuvre, switch off the electricity supply to the automation.

•        To avoid breaking the key, do not apply excessive force.

This command makes it possible to release the operator transmission and to perform leaf movement manually. It can be used in the case of a blackout or 
system malfunction.
The release is activated using a wrench, which must be kept in a safe place.

3

6

7

3

6

7

2

3

4

1

5

1

5

a)    Lift the lock protection cover (1).

b)    Insert the key (2) into the lock and turn clockwise through 360°.

c)    The leaf is now free and can be moved manually.

d)    To relock the leaf, insert the key (2) and turn anticlockwise through 360°.

1

2

360°

2

360°

BLOCCAGGIO

SBLOCCAGGIO

Summary of Contents for Optimo OP3

Page 1: ...ADVERTENCIAS PARA LA INSTALACI N EL USO Y EL ACTUADOR LINEAL ELECTROMEC NICO PARA CANCELAS INSTRUCTIONS ET CONSEILS POUR L INSTALLATION L UTILISATION ET ACTIONNEUR LINEAIRE ELECTROMECANIQUE POUR PORT...

Page 2: ...ety in the usage of motorised doors testing methods EN 12453 Industrial commercial and garage doors and gates Safety in the usage of motorised doors Requisites EN 60204 1 1997 Machinery safety Electri...

Page 3: ...e uma automatiza o tipo ver figura Tab 1 Bestandteile und Vorrichtungen eines Musterantriebs siehe Abbildung 2 OPTIMO Tab 2 Description of the contents of the OPTIMO operator pack see figure Tab 2 Des...

Page 4: ...800 Lubrication Type grease Net rod travel mm 300 450 300 450 Thermal protection device C 140 NO Stop plate YES YES YES YES YES YES Electromechanical limit switches YES YES YES YES YES YES Optic encod...

Page 5: ...E OP3 745 mm E OP5 895 mm 80 2 2 Typical installation A TWO LEAF SYSTEM The definition of leaf 1 and leaf 2 of the gate is essential for automation operation Leaf 1 is the fir Leaf 2 is the second B...

Page 6: ...hat the surface is suitable for clamping with screws or by means of welding d Fix with screws or by means of welding the rear bracket 1 to the pillar in the established position e Make sure that the r...

Page 7: ...d opening position loosen the suppor lock again by tightening 9 Definitively fix the front bracket 2 of the operator to the leaf of the gate choosing the clamping means to suit the material of the lea...

Page 8: ...led versions have an extra cable for the encoder and limit switch signal 2 wired cable The 230V models come with a capacitor which is housed in the control unit The capacitor is connected in parallel...

Page 9: ...OP324 OP524 9 10 9 5RI0950000 OP3 OP3L OP3UNI OP3LUNI OP5 OP5L OP5UNI OP5LUNI 10 5RI0960000 OP324 OP324UNI OP524 OP524UNI 11 12 11 5RI0970000 OP3 OP3L OP324 12 5RI0980000 OP5 OP5L OP524 OP3 OP5 DESCR...

Page 10: ...1030000 OPTIMO 18 5RI01040000 OPTIMO 19 5RI01060000 OPTIMO 20 5RI01070000 OPTIMO 22 5RI01080000 OP3 OP3L OP3UNI OP3LUNI OP5 OP5L OP5UNI OP5LUNI 18 23 23 5RI2750000 OP3UNI OP3LUNI OP324UNI OP5UNI OP5LU...

Page 11: ...es Safety in the usage of motorised doors testing methods EN 12453 Industrial commercial and garage doors and gates Safety in the usage of motorised doors Requisites EN 60204 1 1997 Machinery safety E...

Page 12: ...Address Via Sandro Pertini 3 5 31014 Colle Umberto TV Italia Telephone 39 0438 388592 Telefax 39 0438 388593 http www homelife it e mail info homelife it Numero verde LOGO...

Reviews: