10
LIFE | M9 X/M9 X UC NG
LifeIonizers.com/support
You must run 2-3 gallons of water through the pre-filters before you
connect them to the ionizer. To do this, install the pre filters into their
housings, connect a peace of tubing to the outlet connection on the
pre filter housing and run it into the sink so you can flush them out
with water. This hydrates the filters and cleans them from any loose
media. After you finish this procedure, connect your pre filter back to
your ionizer and run normally. This needs to be done every time you
put in new pre-filters.
Important to Remember
Pre-filter Installation
Ionizer Installation
• Plugs located on the bottom of the ionizer must be removed
before installation.
• Do not over tighten the patch cable connection on the back of
the ionizer when plugging in patch cable.
• Run the ionizer and check for leaks at all tubing locations from
the Diverter Valve to the Ionizer itself before operating the unit.