11
STEP 3
Pull the Front Post (39) all the way up and align bolt holes.
Attach the Front Post (39) to the Main Frame (1) with two Hexagon Socket Pan Head Bolts
(25), four Washers (6), and two Nylon Nuts (12). Tighten bolts and nylon nuts with the
Allen Wrench with Phillips Screwdriver and the Multi Hex Tool with Phillips Screwdriver
provided.
Hardware:
(25) Hexagon Socket
Pan Head Cap Bolt
2 PCS
(6) Washer
4 PCS
(12) Nylon Nut
2 PCS
25 6
6 12
39
1
39
1
6
12
25