26
PULLEYS AND PEC CABLE INSTALLATION
Step 1
Attach one end of the Pec Cable (30) onto the Left Pec Arm (11) with one M10 Nylon Lock
Nut (60), one M10x25 Hexagon Head Bolt (66), and two Ø10 Washers (64). Tighten bolt
and nut with two Wrenches provided.
PLEASE REFER TO THE “CABLE LOOP DIAGRAM” SECTION ON PAGE
20.
Hardware:
60
64
66
30
11
2 Wrenches (19-17)
Tool:
Pec Cable
1 Nylon Lock Nut (M10)
2 Washers (Ø10)
1 Hexagon Head Bolt (M10x25)