Dynamic HSL-3 8/40 Anchor Procedure
1.
Place unit into position to be mounted.
2.
Wearing protective glasses, drill down into flooring perpendicularly to the required depth, ensuring that the foot
thickness is being accounted for; refer to
Anchor Selection
and
Foot Dimensions Section
.
3.
Clear out the debris from hole, insert fastener and hammer into hole until flush against frame plate.
4.
Tighten to 18 Foot-Pounds (24Nm).
NOTE: If the legs/frame do not contact the mounting surface
DO NOT
pull down with the fastener or anchor.
Loosen frame hardware and re-tighten to allow machine to align.
Page 25 of 27
Summary of Contents for SMSS-ADD
Page 2: ......
Page 29: ...Foot Dimensions Use below image to determine foot specifications Page 27 of 27 ...
Page 30: ......