background image

9

Technical Support

Global Services

1-800-LIEBERT

Applications  U.S.A.

1-800-222-5877

Outside the U.S.A.

614-841-6755

U.K.

+44 (0) 1793 553355

France

+33 (0) 1 43 60 01 77

Germany

+49 89 99 19 220

Italy

+39 2 98250 1

Netherlands

+31 (0) 475 503333

E-mail

[email protected]

Web site

http://www.liebert.com

Worldwide FAX tech support

+614-841-5471

The Company Behind The Products

With more than 500,000 installations around
the globe, Liebert is the world leader in
computer protection systems.  Since its
founding in 1965, Liebert has developed a
complete range of support and protection
systems for sensitive electronics:

 Environmental systems: close-control air

conditioning from 1.5 to 60 tons.

 Power conditioning and UPS with power

ranges from 250 VA to more than 1000 kVA.

 Integrated systems that provide both

environmental and power protection in a
single, flexible package.

 Monitoring and control — on-site or remote —

from systems of any size or location

 Service and support, through more than 100

service centers around the world, and a 24-
hour Customer Response Center.

6 & 10 kVA

Optional Battery Cabinet

UPStation GXT™

While every precaution has been taken to
ensure accuracy and completeness of this
literature, Liebert Corporation assumes no
responsibility, and disclaims all liability for
damages resulting from use of this information
or for any errors or omissions.

©1999 Liebert Corporation All rights reserved
throughout the world.  Specifications subject
to change without notice.

® Liebert and the Liebert logo are registered
trademarks of Liebert Corporation.  All names
referred to are trademarks or registered
trademarks of their respective owners.

SLI-23147 (9/99) Rev. 0

Summary of Contents for GXT240VBATT

Page 1: ...USER MANUAL English 6 10 kVA Optional Battery Cabinet UPStation GXT...

Page 2: ...sition especially when maneuvering across carpeted areas or uneven surfaces If this cabinet is to be installed on a suspended floor check that the total floor loading presented by the UPS and its batt...

Page 3: ...is instructed to open the UPS battery circuit breaker the circuit breakers on the optional battery cabinets should also be opened CAUTION When the UPS manual instructs the operator to open all circuit...

Page 4: ...g 871 lbs Use adequate handling aids when moving or installing the UPS The cabinet is fitted with castor wheels for easy movement Take care when the cabinet is removed from its packing and being wheel...

Page 5: ...terminals will accept wire sizes up to the values below GXT6000 10 mm 2 8 AWG Recommended for all GXT6000 wiring GXT10000 16 mm 2 6 AWG Recommended for all GXT10000 wiring 75 C copper wire Terminal ti...

Page 6: ...essary using a 12mm open ended wrench DO NOT LOOSEN THE LARGER NUT ABOVE AS THIS FIXES THE LEVELING FEET TO THE CHASSIS Attach the stabilizing brackets as follows GXT240VBATT or GXT240VBATTUL models 1...

Page 7: ...the rear of the battery cabinets off Perform all UPS commissioning instructions in the UPS manual using only the internal batteries controlled by the circuit breaker on the rear of the UPS 4 Next com...

Page 8: ...Certain repairs or services are the responsibility of the Purchaser and the Purchaser is expected to pay for them This warranty does not extend either to products with removed or altered serial number...

Page 9: ...m 250 VA to more than 1000 kVA Integrated systems that provide both environmental and power protection in a single flexible package Monitoring and control on site or remote from systems of any size or...

Reviews: