Installation Kits Contents
Suggested Tool Requirements
1
2
3
4
5
6
7
8
9
10
11
14
12
13
NO.
NAME OF PARTS
Q'TY
1
FRAME CURTAIN
2
2
SUPPORT BRACKET
2
3
SILL BRACKET
2
4
LOCK NUT
4
5
SCREW (TYPE A)
1
1
6
SCREW (TYPE B)
7
7
SCREW (TYPE C)
5
8
SCREW (TYPE D)
2
9
CARRIAGE BOLT
2
10
FOAM STRIP
1
11
FOAM SEAL
1
12
WINDOW LOCKING BRACKET
1
13
DRAIN PIPE
1
14
FRAME GUIDE
2
11
(Type A)
5
14
Shipping
Screws
Upper guide
PREPARATION OF CHASSIS
Remove the screws which fasten the cabinet at both
sides and at the back.
Slide the unit from the cabinet by gripping the base pan
handle and pulling forward while bracing the cabinet.
Cut the window sash seal to the proper length.
Peel off the backing and attach the Foam-Seal to the
underside of the window sash.
Insert the Frame Guides into the bottom of the
cabinet.
Insert the Frame Curtain into the Upper Guide and
Frame Guides .
Fasten the curtains to the unit with 10 Type
A screws .
6
5
4
3
2
1
SCREWDRIVER(Philips and Flatead), RULER, KNIFE, HAMMER, PENCIL, LEVEL
5
WP Series
20
Room Air Conditioner
Hardware Installation