ENGLISH
Installation Manual
15
Installation
Installation
Foundation for Installation
• Check the strength and level of the installation ground so that the unit will not cause any operating vibration or
noise after installation.
• Fix the unit securely by means of the foundation bolts. (Prepare 4sets of M12 foundation bolts, nuts and
washers each which are available on the market.)
• It is best to screw in the foundation bolts until their length are 20mm from the foundation surface.
If it is necessary to prevent the unit from falling over, install as shown in the figure.
• Prepare all 4 wires as indicated in the drawing
• Unscrew the top plate at the 4 location indicated A and B
• Put the screws through the nooses and screw them back tight
A : Location of the 2 fixation holes on the front side of the unit
B : Location of the 2 fixation holes on the rear side of the unit
C : wires
[Unit:mm]
Foundation bolt executing method
200
Nut
75
75
200
Spring washer
Frame
Anti-vibration
materials
Four bolt are
required
3 thread ridges
H-Beam
Concrete
base
100
A
B
C
Summary of Contents for Multi V mini ARUV Series
Page 64: ...Memo 64 Outdoor Unit ...