• Install at places where it can endure the weight and vibration/noise
of the outdoor unit.
• The outdoor unit supports at the bottom shall have width of at least
100mm under the Unit’s legs before being fixed.
• The outdoor unit supports should have minimum height of 200mm.
• Anchor bolts must be inserted at least 75mm.
At least 100mm
At least 100
mm
At least 100mm
At least 100mm
At least 100mm
At least 100mm
Center of the Unit
For outdoor units
should not be
supported only by
the corner supports.
Center of the Unit
7
3
0
76
0
65
65
Unit : mm
A
t least 65
A
t least 65
Chassis
Outdoor Unit Capacity
A(mm)
B(mm)
UX2
8~12 HP
920
792
UX3
14~20 HP
1240
1102
• Fix the unit tightly with bolts as shown below so that unit will not fall
down due to earthquake or gust.
• Use the H-beam support as a base support
• Noise and vibration may occur from the floor or wall since vibration is
transferred through the installation part depending on installation sta-
tus. Thus, use anti-vibration materials (cushion pad) fully (The base
pad shall be more than 200mm).
At least
200mm
• Install the outdoor unit at the higher installation console by 50cm
than the average snowfall (annual average snowfall) if it is installed at
the area with much snowfall.
• Where snow accumulated on the upper part of the Outdoor Unit by
more than 10cm, always remove snow for operation.
- The height of H frame must be more than 2 times the snowfall and
its width shall not exceed the width of the product. (If width of the
frame is wider than that of the product, snow may accumulate)
- Don't install the suction hole and discharge hole of the Outdoor
Unit facing the seasonal wind.
CAUTION
Be very careful while carrying the product.
• Do not have only one person carry product if it is more than 20 kg.
• PP bands are used to pack some products. Do not use them as
a mean for transportation because they are dangerous.
• Do not touch heat exchanger fins with your bare hands. Other-
wise you may get a cut in your hands.
• Tear plastic packaging bag and scrap it so that children cannot
play with it. Otherwise plastic packaging bag may suffocate chil-
dren to death.
• When carrying in Outdoor Unit, be sure to support it at four
points. Carrying in and lifting with 3-point
support may make Outdoor Unit unstable, resulting in a fall.
• Use 2 belts of at least 8 m long.
• Place extra cloth or boards in the locations where the casing
comes in contact with the sling to prevent damage.
• Hoist the unit making sure it is being lifted at its center of gravity.
• When carrying the suspended, unit pass the ropes under the unit and
use the two suspension points each at the front and rear.
• Always lift the unit with ropes attached at four points so that impact
is not applied to the unit.
• Attach the ropes to the unit at an angle of 40° or less.
Locking points for
transportation ropes
Forklift Carrying Guide
Forklift Carrying Hole
!
LIFTING METHOD
Foundation for Installation
The location of the Anchor bolts
INSTALLATION
Summary of Contents for MULTI V IV ARUB080BTE4
Page 40: ...40 ENGLISH ...
Page 41: ......