Note: Overlap the connection pipe insulation material and the indoor unit pipe insulation material. Bind
them together with vinyl tape so that there may be no gap.
Installation
Cutting the Pipe for
3/8inch (9.52mm).
Cutting Position is less
than 0.4inch (10mm).
Liquid pipe
Gas pipe
Brazing for
1/4inch(6.35mm)
Cap
Brazing
Cut the edge
Liquid pipe
Gas pipe
Cutting the Pipe for
Cutting the Pipe for
3/8inch (9.52mm).
3/8inch (9.52mm).
Cutting Position is less
Cutting Position is less
than 0.4inch (10mm).
than 0.4inch (10mm).
Cutting the Pipe for
3/8inch (9.52mm).
Cutting Position is less
than 0.4inch (10mm).
Cutting the Pipe for
3/8inch (9.52mm).
Cutting Position is less
than 0.4inch (10mm).
Liquid pipe
Liquid pipe
Gas pipe
Gas pipe
Liquid pipe
Brazing for
Brazing for
1/4inch(6.35mm)
1/4inch(6.35mm)
Brazing for
1/4inch(6.35mm)
Brazing for
1/4inch(6.35mm)
Gas pipe
Cap
Cap
Cap
Brazing
Brazing
Brazing
Cut the edge
Liquid pipe
Gas pipe
Cutting the Pipe for
3/8inch (9.52mm).
Cutting Position is less
than 0.4inch (10mm).
Liquid pipe
Gas pipe
Brazing for
1/4inch(6.35mm)
Cap
Brazing
Cut the edge
Cut the edge
Liquid pipe
Liquid pipe
Gas pipe
Gas pipe
Cut the edge
Liquid pipe
Gas pipe
Cutting the Pipe for
3/8inch (9.52mm).
Cutting Position is less
than 0.4inch (10mm).
Liquid pipe
Gas pipe
Brazing for
1/4inch(6.35mm)
Cap
Brazing
Lower
front
panel
Upper
front
panel
Refrigerant
pipe cover
Cut the edge
Liquid pipe
Gas pipe
4. Detach Liquid and Gas Pipe
- Gas Pipe: Remove the Cap by Brazing
- Liquid Pipe: There are 2 kinds of Liquid Pipe.
3. Cut the refrigerant pipe (Liquid Pipe edge)
and make sure the factory charged refriger-
ant is emerging out. (This confirms there is
no leakage.)
- If you do not use proper cutter size
when cutting liquid pipe, it would make
damage to the gas pipe.
Completely remove the refrigerant and then do brazing. Otherwise, high pressure is a risk
of injury due to explosions
Liquid Pipe
Detach Pipe
1/4 (6.35)
Brazing
3/8 (9.52)
Cutting
ENGLISH
Installation Manual
13
5. Connect the field piping by brazing.
- Wrap the gas and liquid pipe with wet towel.
(If not wrapped with a wet towel, there may
be damages drain pan or pipe insulations.)
6. Attach the two panels to the body.