28
Air Conditioner
Indoor Unit Drain Piping
Heat insulation
CAUTION : The supplied
flexible drain hose should not
be curved, neither screwed. The
curved or screwed hose may
cause a leakage of water.
• Connect the main drain pipe to the exterior and
leave it provisionally until the test comes to an
end.
• Feed water to the flexible drain hose and check
the piping for leakage.
• Be sure to check the drain pump for normal
operating and noise when electrical wiring is
complete.
• When the test is complete, connect the flexible
drain hose to the drain port on the indoor unit.
The air conditioner uses a drain pump to drain water.
Use the following procedure to test the drain pump operation:
Drain test
Feed water
Drain Pump
Drain pan
Flexible drain hose
(accessory)
Main
drain pipe
Glue the joint
Drain
port
Drain hose connection
Use the clip (accessory)
Flexible drain hose
1/50~1/100
Flexible drain hose
Flexible drain hose
1. Use the heat insulation material for the refrigerant piping which has an excellent heat-resistance
[over 120°C(248°F)].
2. Precautions in high humidity
circumstance:
This air conditioner has been tested
according to the "KS Standard Conditions
with Mist" and confirmed that there is not
any default. However, if it is operated for a
long time in high humid atmosphere [dew
point temperature: more than
23°C(73.4°F)], water drops are liable to
fall. In this case, add heat insulation
material according to the following
procedure:
• Heat insulation material to be prepared... Adiabatic glass wool with thickness 10 to 20mm.
• Stick glass wool on all air conditioners that are located in ceiling atmosphere.
Indoor unit
Thermal insulator
(accessory)
Fastening band
(accessory)
Refrigerant piping
Summary of Contents for MFL40910614