![LG LT-B2421CL Service Manual Download Page 24](http://html.mh-extra.com/html/lg/lt-b2421cl/lt-b2421cl_service-manual_1892006024.webp)
–24–
• The dimensions of the paper model for installing are
the same as those of the ceiling opening dimen-
sions.
• Select and mark the position for fixing bolts and pip-
ing hole.
• Decide the position for fixing bolts slightly tilted to
the drain direction after considering the direction of
drain hose.
• Drill the hole for anchor bolt on the wall.
Level gauge
Unit:mm
Ceiling
800 Unit size
800 Unit siz
e
720 (Hanging bolt)
60
60
840 (Ceiling opening)
840 (Ceiling opening)
624(Hanging bolt)
108
108
600
120
120
Ceiling board
• This air-conditioner uses a drain pump.
• Horizontly install the unit using a level gauge.
• During the installation, care must be taken not to
damage electric wires.
CAUTION
2. Ceiling opening dimensions and hanging bolt location