- 25 -
Copyright ©2012 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
W
ALL SECTION – DET
AILED SIDE VIEW
FRAME AND BRICK VENEER INST
ALLA
TION
Cord Set Connected
CAULK*
Sub-Base Connected
CAULK*
STEE
L
L
INTE
L
R
A
B71
13-3/4"
R
A
B77
13-7/
8"
20
-7/
8"
(R
A
B71
)
2
1
"
(R
A
B77
)
ROOM
CABINET
2"
MI
N.
M
O
U
NTIN
G
S
CRE
W
S
BY I
NSTALL
E
R
W
ALL CASE
OUT
D
O
O
R
GR
ILL
E
CAULK*
CAULK*
1/4"
MI
N.
PO
W
ER
S
UP
P
L
Y
C
OND
UI
T
W
ALL
RE
CE
P
T
A
C
L
E
(BY
O
T
H
E
RS)
F
INIS
HE
D
FLO
O
R
OR
T
OP
OF
CA
R
P
ET
*C
aulk
around
perimeter
of
wall
case
all
four
sides
w
h
ere
it
j
oins
t
he
b
uildin
g
- I
nterior
and
E
x
terior
.
CAULK*
1/4"
CAULK*
L
INTE
L
ROOM
CABINET
2"
MI
N.
M
O
U
NTIN
G
S
CRE
W
S
BY I
NSTALL
E
R
W
ALL CASE
OUT
D
O
O
R
GR
ILL
E
SI
DE
C
H
A
NNE
L
3"
MI
N.
5"
MA
X
.
1-
5/
16"
F
INIS
HE
D
FLO
O
R
OR
T
OP
OF
CA
R
P
ET
S
U
B-B
A
SE
(RA
K
2
0
4
)
CAULK*
PO
W
ER
S
UP
P
L
Y
C
OND
UI
T
(AL
TE
R
N
A
TE ENT
R
Y
)
3-11/1
6"
*C
aulk
around
perimeter
of
wall
case
all
four
sides
w
h
ere
it
joins
t
he
b
uildin
g
- I
nterior
and
E
x
terior
.
2
-3/
8"
Summary of Contents for LP093CD3B
Page 53: ......