![LG LD1454WBFES2 Service Manual Download Page 28](http://html.mh-extra.com/html/lg/ld1454wbfes2/ld1454wbfes2_service-manual_1896374028.webp)
6. Tub Sub Assembly
1) Top Frame
①
Remove front 2 screws.
②
Remove side 2 screws.
③
Lift up top frame.
2) Balance Weight
①
Remove 2 screws.
②
Lift up balance weight.
3) Overflow Guide (R/L)
①
Remove 1 screw of right side.
②
Remove 1 screw of left side.
4) Steam Nozzle (Steam models only)
①
Remove side 4 screws.
②
Push the steam nozzle.
③
Pull up the overflow guide.
④
Pull up the packing of right/left side.
⑤
Pull up the strip.
28
Summary of Contents for LD1454WBFES2
Page 2: ......
Page 19: ...5 WIRING DIAGRAM 19 ...
Page 20: ...20 ...
Page 52: ...10 EXPLODED VIEW A001 A020 A010 A050 A040 F001 51 E006 G009 ACCESSORIES Hardness Strip ...
Page 62: ...A157 A147 A144 A146 A142 A140 A070 A060 A156 A080 A150 A090 A155 A101 A102 A103 A110 61 ...
Page 63: ...P No MFL63726506 ...