CABINET
AIR DISCHARGE
VERTICAL AIR DEFLECTOR
(HORIZONTAL LOUVER)
CONTROL BOARD
CONDENSER
COMPRESSOR
EVAPORATOR
POWER CORD
BASE PAN
BRACE
SIDE LOUVER
A
Power cord
Screw (Type A)
Power cord
FRONT GRILLE
AIR FILTER
AIR INTAKE
(INLET GRILLE)
B
Screw (Type A)
9
ENGLISH
Learning parts name prior to installation will help you understand the installation procedure.
Features
Installing the Power cord
You can choose between the two methods below according to your preference and window sill shape.
• Fasten the stopper using Type A screw, and pass
the power cord through slit "A".
• Fasten the stopper using left screw hole, and rotate
properly to pass the power cord through slit "B".
Using slit "A"
Using slit "B"
Hardware Installation
Hardware
Installation
Summary of Contents for LC1000
Page 16: ...16 MEMO ...
Page 32: ...16 NOTE ...