53
47
1. Remove the six connectors from the generator.
2. Remove the thermistor screw from the generator.
3. Remove the steam harness cable tie holder in the rear tub.
4. Replace the steam harness and assemble the cable tie holder in the rear tub.
5. Assemble the steam harness.
6. Attach the thermistor and the screws to the generator.
Summary of Contents for DLEX4370 Series
Page 2: ...2 2 ...
Page 8: ...8 8 ...
Page 9: ...9 9 3 2 Connecting the gas supply ...
Page 10: ...10 10 21 8 150 800 800 Connect Inlet Hose ...
Page 11: ...11 ...
Page 13: ...13 13 ...
Page 16: ...16 16 Heater Relay Black Heater Relay Blue AG Heater Relay White YL3 WH4 BL2 NA7 NA6 NA4 ...
Page 17: ...17 17 Heater Relay Black Heater Relay Blue YL3 WH4 BL2 NA7 NA6 NA4 BL3 ...
Page 19: ...19 19 ...
Page 22: ...22 Electric Dryer Table 1 Resistance for Thermistor Temperature WH6 OR ...
Page 24: ...24 Gas Dryer ...
Page 25: ...25 Gas Dryer Table 1 Resistance for Thermistor Temperature WH6 OR ...
Page 30: ...30 dryin ...
Page 31: ...31 ...
Page 32: ...32 25 120V AC Electrical Supply ...
Page 33: ...33 26 t r c t c o m h t t ...
Page 35: ...35 28 Thermistor Test Measur e with Power Off ...
Page 37: ...37 PCB ...
Page 38: ...38 PCB ...
Page 39: ...39 element ...
Page 40: ...40 33 GAS V alve test Gas T ype GAS Valve Test Gas Type Ω dc ute dc dc s o l i ...
Page 41: ...41 DC pum ...
Page 43: ...43 36 ...
Page 55: ...55 50 13 1 Control Panel and Plate Assembly A140 A210 A211 A213 A110 A120 ...
Page 60: ...60 MAR 2017 PRINTED IN KOREA MFL69290405 FOR LG TECHNICIAN ...