27
INSTALLATION
ENGLISH
Four-Wire Power Cord
•
A UL-listed strain relief is required.
•
Use a 30-amp, 240-volt, 4-wire,
UL-listed power cord with #10 AWG-
minimum copper conductor and closed
loop or forked terminals with upturned
ends.
1
Remove the terminal block access cover on the
upper back of the dryer.
2
Install a UL-listed strain relief into the power
cord through-hole.
3
Thread a 30-amp, 240-volt, 4-wire, UL-listed
power cord with #10 AWG-minimum copper
conductor through the strain relief.
Terminal Block
Terminal Block
UL-Listed Strain Relief
UL-Listed Strain Relief
UL-Listed 4-Wire Power
UL-Listed 4-Wire Power
Cord
Cord
4
Transfer the dryer’s ground wire from behind the
green ground screw to the center screw of the
terminal block.
5
Attach the two hot leads of the power cord to the
outer terminal block screws.
6
Attach the white neutral wire to the center screw
of the terminal block.
7
Attach the power cord ground wire to the green
ground screw.
8
Tighten all screws securely.
9
Reinstall the terminal block access cover.
Hot (Black)
Hot (Black)
Ground Screw
Ground Screw
Power Cord Ground
Power Cord Ground
Wire
Wire
White Wire
White Wire
moved from
moved from
Ground Screw
Ground Screw
Hot (Red)
Hot (Red)
Neutral (White)
Neutral (White)
Summary of Contents for DLE3 0 Series
Page 52: ...52 MEMO ...
Page 53: ...53 MEMO ...
Page 54: ...54 MEMO ...
Page 55: ...55 MEMO ...
Page 56: ...56 MEMO ...