13
INSTALLATION
ENGLISH
Closet Ventilation Requirements
Closets with doors must have both an upper and lower vent to prevent heat and moisture buildup in the closet.
One upper vent opening with a minimum opening of 48 sq. in. (310 cm
2
) must be installed no lower than 6 feet
above the floor. One lower vent opening with a minimum opening of 24 sq. in. (155 cm
2
) must be installed no
more than one foot above the floor. Install vent grills in the door or cut down the door at the top and bottom to
form openings. Louvered doors with equivalent ventilation openings are also acceptable.
NOTE
There should be at least a little space around the dryer (or any other appliance) to eliminate the transfer of
vibration from one appliance to another. If there is enough vibration, it could cause appliances to make noise
or come into contact, causing paint damage and further increasing noise.
Installation Spacing for Recessed Area or Closet, with Stacked Washer and
Dryer
48 in.
2*
(310 cm
2
)
3"*
(76 mm)
6"*
(152 mm)
3"*
(76 mm)
1"*
(25 mm)
77
1
/
2
"
(1968 mm)
5
1
/
2
"
(140 mm)
1"*
(25 mm)
1"*
(25 mm)
27"
(686 mm)
24 in.
2*
(155 cm
2
)
* Required spacing
** For side or bottom venting, 2-inch (5.1 cm) of spacing is allowed.
Installation Spacing for Cabinet
For cabinet installation with a door, minimum ventilation openings in the top of the cabinet are required.
* Required spacing
(178 mm)
(178 mm)
5"*
(127 mm)
1"*
(25 mm)
30.2"*
(765 mm)
27"*
(686 mm)
1"*
(25 mm)
1"*
(25 mm)
9"*
(229 mm)
MFL67652524_en_180911.indd 13
2018-09-11 오후 2:04:13
Summary of Contents for DF20WV2
Page 57: ...Memo MFL67652524_en_180911 indd 56 2018 09 11 오후 2 04 20 ...
Page 58: ...Memo MFL67652524_en_180911 indd 57 2018 09 11 오후 2 04 20 ...
Page 59: ...Memo MFL67652524_en_180911 indd 58 2018 09 11 오후 2 04 20 ...
Page 115: ...Memo MFL67652524_sp_180911 indd 56 2018 09 11 오후 2 04 45 ...
Page 116: ...Memo MFL67652524_sp_180911 indd 57 2018 09 11 오후 2 04 45 ...
Page 117: ...MFL67652524_sp_180911 indd 58 2018 09 11 오후 2 04 45 ...