29
1.
Remove screw & exhaust duct.
PORTION “A”
DUCT
TAPE
DUCT
TAPE
DUCT
TAPE
3.
Reconnect the new duct[11 in(28cm)] to the
blower housing, and attach the duct to the base.
2.
Detach and remove the bottom, left or right side
knockout as desired.
4.
Pre-assemble 4" elbow with 4" duct.
Wrap duct tape around joint.
5.
Insert duct assembly, elbow first, through the side
opening and connect the elbow to the dryer
internal duct.