5
2
TIPS FOR SAVING
ENERGY
3
IMPORTANT SAFETY
INSTRUCTIONS
6
INSTALLATION PLACES
7
THE INDOOR UNIT
INSTALLATION
8
- Open side-cover
9
- Mounting the anchor nut and bolt
11
Indoor Unit Drain Piping
11
Drain piping
11
Drain test
12
Heat insulation
12
- Connecting cables to the indoor unit
12
- Wiring Connection
13
- Precautions when laying power wiring
14
TEST RUNNING
14
- PRECAUTIONS IN TEST RUNNING
14
- Check the following items when instal-
lation is complete
14
- Connection of power supply
14
- Evaluation of the performance
15
- HAND OVER
TABLE OF CONTENTS
TABLE OF CONTENTS
ENGLISH
Summary of Contents for AVNQ18GJLA1
Page 16: ...Memo ...
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ... ข อควรระวังเมื อวางสายไฟ ...
Page 22: ......
Page 23: ......
Page 24: ......
Page 26: ......
Page 27: ...นํ า นํ า นํ า ปลายของท อระ บายนํ าจุ มอยู ใน นํ า นํ า นํ า แท นยึด ...
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......