Electrical Wiring
Installation Manual
83
ENGLISH
Cool and Heater Selector Installation and Connection
• Connect wires as below figure at the hole of backside of Outdoor Unit Dry Contact.
• Insert the wire in the connection hole pushing the "Push" button.
• Setting Main PCB Dip SW of Master Outdoor Unit.
GND
GND
GND
¨≠
GND
GND
¨≠
GND
< Outdoor Main PCB >
- Insert wire method -
shows field wiring
connected wiring
Push arrow direction.
Insert wire to connector.
Push Button
<Outdoor Dry Contact Back Side >
¨
≠
¨
≠
GND
GND
GND
1
2
3
4
1
2
3
4
¨≠
GND
¨
≠
GND
Without Cool/Heat Selector Installation and Connection
In case, try to set mode without Cool/Heat Selector and try to use other switch except from LG Outdoor
Cool/Heat Selector in field.
Connect signal terminal block as below figure and description.
- How to set mode without Cool/Heat Selector
• Cooling Mode Setting
➀ ➔
GND Connection
➁ ➔
Off (Open)
• Heating Mode Setting
➀ ➔
GND Connection
➁ ➔
GND Connection
• Fan/ All OFF Mode Setting
➀ ➔
Off (Open)
➁ ➔
GND Connection
❈
Communication line length can be maximum 300m, use communication line as thick as 1.25mm
2
.
Summary of Contents for ARUN Series
Page 121: ......