Installation
• This unit may be installed suspended from the ceiling or mounted on the wall.
• This unit may only be installed horizontally , as shown in the diagram below.(Side B is facing up)
However, it may be freely installed in any direction forward or back, and to the sides.
• Be sure to leave a 600mm square opening for service and inspection as shown in the diagram
below, for both ceiling - suspended installation and wall-mounted installation.
• This unit "does not require drain treatment" as it uses internal foam treatment as low-pressure
piping insulation.
• Service direction is the side B and C
• The piping for the indoor unit may be led around in direction A
• The inclination of side B must be within ±5 degrees forward or back or to the sides.
50
30
(111)
B
C
50
50
50
50
50
50
(56)
50
(38)
(36)
Min 400
Min 30
600
Min 400
Inspection opening
(Servicing space)
Min 300
(298)
250
Ø19.05
Ø9.52
Suspension bolt pitch.
245
(337)
A
Main Pipe
Cover Control
Branch Pipe
60
300
72
(150)
Flaring Work and Connection of Piping
16
Multi Air Conditioner