FLARING WORK AND CONNECTION OF PIPING
ENGLISH
17
Indoor unit installation
Hook the indoor unit onto the upper portion of
the installation plate.(Engage the two hooks of
the rear top of the indoor unit with the upper
edge of the installation plate.) Ensure that the
hooks are properly seated on the installation
plate by moving it left and right.
Press the lower left and right sides of the unit
against the installation plate until the hooks
engage into their slots(clicking sound).
Connecting the pipings to the indoor unit and
drain hose to drain pipe
- Align the center of the pipings and sufficient-
ly tighten the flare nut by hand.
- Tighten the flare nut with a wrench.
- When extending the drain hose at the indoor
unit, install the drain pipe.
Wrap the insulation material around the con-
necting portion.
- Overlap the connection pipe insulation mate-
rial and the indoor unit pipe insulation materi-
al. Bind them together with vinyl tape so that
there is no gap.
- Wrap the area which accommodates the rear
piping housing section with vinyl tape.
Outside diameter
A
mm
inch
mm
Ø6,35
1/4
1,1 – 1,3
Ø9,52
3/8
1,5 – 1,7
Ø12,7
1/2
1,6 – 1,8
Ø15,88
5/8
1,6 – 1,8
Ø19,05
3/4
1,9 – 2,1
Drain hose
Connecting
Indoor unit tubing
Flare nut
Pipings
Torque wrench
Indoor unit tubing
Spanner (fixed)
Connection pipe
Flare nut
Vinyl tape(narrow)
Adhesive
Drain pipe
Indoor unit drain hose
Plastic bands
Insulation material
Vinyl tape(narrow)
Connection
pipe
Connecting cable
Vinyl tape
(wide)
Wrap with vinyl tape
Indoor
unit pipe
Pipe
Summary of Contents for A3UQ24GFD0
Page 39: ......