20
TEST RUNNING
ENGLISH
TEST RUNNING
Precautions in test running
- The initial power supply must provide at least
90% of the rated voltage.
Otherwise, the air conditioner should not be
operated.
- To cancel the test run, press any button.
Check the following items when
installation is complete
After completing work, be sure to measure
and record trial run properties, and store
measured data, etc.
Measuring items are room temperature, out-
side temperature, suction temperature, blow
out temperature, wind velocity, wind volume,
voltage, current, presence of abnormal vibra-
tion and noise, operating pressure, piping tem-
perature, compressive pressure.
As to the structure and appearance, check fol-
lowing items.
- Is the circulation of air adequate?
- Is the draining smooth?
- Is the heat insulation complete
(refrigerant and drain piping)?
- Is there any leakage of refrigerant?
- Is the remote controller switch operated?
- Is there any faulty wiring?
- Are not terminal screws loosened?
M4......118N.cm{12kgf.cm}
M5......196N.cm{20kgf.cm}
M6......245N.cm{25kgf.cm}
M8......588N.cm{60kgf.cm}
Connection of power supply
Connect the power supply cord to the inde-
pendent power supply.
- Circuit breaker is required.
Operate the unit for fifteen minutes or more.
Evaluation of the performance
Measure the temperature of the intake and
discharge air.
Ensure the difference between the intake
temperature and the discharge one is more
than 8°C (Cooling).
Thermometer
CAUTION
• For test run, carry out the cooling
operation firstly even during heating
season. If heating operation is carried
out firstly, it leads to the trouble of
compressor. Then attention must be
paid.
• Carry out the test run more than 5
minutes without fail.
(Test run will be cancelled 18 minutes
later automatically)
!
Summary of Contents for 36k
Page 1: ......