6
ENG
ENGLISH
INSTALLATION PREPARATION
Unpacking and Cabling
1
Lift up the cover of the box.
2
Remove the top packaging.
3
Hold both sides of the product and lift it up.
5
Place a soft cloth on the table and put the
product down with the screen facing downward.
4
Remove the poly bag.
6
Connect the LVDS cable(Additional assembly
is required). A scaler board or LVDS cable is
optional and not provided with the product.
26TS30MF
Summary of Contents for 26TS30MF
Page 21: ...P NO 3840TRL098E 0801 REV00 ...