
Installation
35
300750767_002_C3 - 12/2020 - © Leybold
Establishing Potential Equalisation
An M 6 thread is provided at the motor housing for connecting the external
potential equalisation cable, see Fig. 3.1.
3.7 Leak Search after Installation
On delivery, the pump is leak tight to < 10
-4
mbar
·
l/s (integral, leak-checked).
Leak-check all relevant connections after having installed the pump.