Leviton Verifeye 8000 Series Installation Manual Download Page 3

WARNING:

•  

HIGH VOLTAGE: RISK OF ELECTROCUTION, SHOCK, EXPLOSION, OR ARC FLASH.

•  

This equipment 

MUST

 be installed and serviced by qualified electrical personnel with the 

requisite knowledge, training and experience related to the installation and operation of 
this equipment.

•  

TO AVOID FIRE, SHOCK OR DEATH,

 turn off all power supplying equipment before 

working on or inside the equipment. Use a properly rated voltage sensing device to 
confirm power is off.

•  

Follow safe electrical work practices. See NFPA 70E in the USA, or applicable local codes.

•  

Product may use multiple voltage/power sources. Be sure all sources of power have been 
disconnected before servicing.

•  

Do not depend on this product for voltage indication.

•  

Only install this product on insulated conductors.

•  

If the meter appears damaged or defective, first disconnect all power to the meter. 
Then call or email technical support for assistance.

•  

The equipment must be accessible to authorized personnel only. Equipment must be 
installed in areas where access can be restricted.

• 

DO NOT

 work alone.

•  

Before closing all covers and doors, carefully inspect the work area for tools and objects 
that may have been left inside the equipment.

• 

DO NOT

 bypass external fusing.

• 

DO NOT

 short the secondary of a Voltage Transformer (VT).

•  

Always short the secondary of a current transformer prior to disconnecting current 
input loads.

CAUTION:

• 

Use the unit only in accordance with the electrical power rating

• 

Initial installation of the unit must be inspected by the local electrical Inspection Authority

• 

Install the unit in compliance with the following local and national electrical codes:

 

 

• Canada: Canadian Electrical Code, Part I, CSA C22.1

  • 

 

United States: National Fire Protection Association (NFPA) 70; US National 
Electrical Code

 

 

• Elsewhere: International Electrotechnical Commission (IEC) 364, Part 1-7

• 

Ensure that the unit is properly earthed

•  

If the equipment is installed or used in a manner other than that specified in this document, 
it may void your warranty or impair the protection of the equipment.

WEB 

VERSION

Summary of Contents for Verifeye 8000 Series

Page 1: ...DI DPT S480V 00A VerifEye Series 8000 PT Module Cat No S480V Installation Guide WEB VERSION ...

Page 2: ... Delta PT module in 600V three phase 3 wire system 7 2 3 Install 347V Wye 600V Delta PT module in 347V three phase 4 wire system 8 2 4 Install 480V Delta PT module in 480V three phase 3 wire system 9 3 Maintenance 9 3 1 Fuse Replacement 9 4 Regulatory Compliance 10 4 1 Equipment servicing and access 10 5 Warranty and Contact Information 11 WEB VERSION ...

Page 3: ...ssible to authorized personnel only Equipment must be installed in areas where access can be restricted DO NOT work alone Before closing all covers and doors carefully inspect the work area for tools and objects that may have been left inside the equipment DO NOT bypass external fusing DO NOT short the secondary of a Voltage Transformer VT Always short the secondary of a current transformer prior ...

Page 4: ...e input metering sense voltages and the auxiliary input power required by VerifEye Series 8000 energy meters There are two variants of the VerifEye Series 8000 PT module that support the following source voltages and wiring configurations 1 The 347V Wye 600V Delta variant supports 347V three phase 4 wire wye 600V three phase 3 wire delta 2 The 480V Delta variant supports 480V three phase 3 wire del...

Page 5: ...e outputs F4 T250 mA 250V F5 F6 F7 Transformer specifications Input voltage 600V Voltage tolerance 10 480V 347V Output voltage 120V Accuracy 0 3 Environmental Operating temperature 40 to158 F 40 to 70 C Operating humidity 5 to 90 non condensing Usage environment Indoor or enclosed outdoor environment Maximum altitude 9843 ft 3000 m Pollution degree 2 Table 1 VerifEye PT module specifications WEB VER...

Page 6: ...ch installation may vary depending on physical site restrictions Figure 1 shows the recommended spacing for mounting the equipment at the installation site Figure 1 Recommended equipment spacing and dimensions 7 59 in 189 8 mm 9 0 in 228 6 mm MIN 3 50 in 88 9 mm 8 39 in 213 1 mm 13 19 in 335 0 mm 13 53 in 343 7 mm 2 25 in 5 4 mm 6 50 in 16 5mm No 8 SCREWS TYPICAL PT ENCLOSURE METER SHORTING OR TER...

Page 7: ...e working on or inside the equipment Use a properly rated voltage sensing device to confirm power is off Follow safe electrical work practices See NFPA 70E in the USA or applicable local codes In all installations the VerifEye Series 8000 PT Module must be connected to the source panel voltage through a 15A maximum disconnect or breaker that disconnects all line and neutral wires so that the PT mod...

Page 8: ...2 Installation 5 Generic Breaker Panel PT Module Shorting Block Module Generic Conduit Figure 2 Typical three phase 4 wire 347V wye system installation WEB VERSION ...

Page 9: ... shown in Figure 3 and as indicated on the printed circuit board 2 Remove the control voltage jumper on the VerifEye meter as shown in Figure 3 3 Connect the source panel disconnector breaker to the VerifEye Series 8000 PT module in accordance with local and national electrical codes 4 Connect the VerifEye Series 8000 PT module to the VerifEye Series 8000 meter using a 3 wire red black blue 14 AWG...

Page 10: ... indicated on the printed circuit board 2 Remove the control voltage jumper on the VerifEye Series 8000 meter as shown in Figure 4 3 Connect the source panel disconnect or breaker to the VerifEye Series 8000 PT module in accordance with local and national electrical codes 4 Connect the VerifEye Series 8000 PT module to the VerifEye Series 8000 meter using a 4 wire red black blue white 14 AWG 1 63 ...

Page 11: ... disconnect or breaker to the VerifEye Series 8000 PT module in accordance with local and national electrical codes 2 Remove the control voltage jumper on the VerifEye Series 8000 meter as shown in Figure 5 3 Connect the VerifEye Series 8000 PT module to the VerifEye Series 8000 meter using a 3 wire red black blue 14 AWG 1 63 mm2 194 F 90 C cable as shown in Figure 5 The maximum cable length betwe...

Page 12: ...OID FIRE SHOCK OR DEATH turn off all power supplying equipment before working on or inside the equipment Use a properly rated voltage sensing device to confirm power is off Follow safe electrical work practices See NFPA 70E in the USA or applicable local codes Replace all devices doors and covers before turning on power to this equipment 1 Remove the outer cover from the unit 2 Locate the fuse to b...

Page 13: ...any of the equipment Visually inspect the equipment yearly and ensure it is free of dust or other particles If necessary wipe with a clean cloth Component servicing Individual components are not user serviceable and must be returned to Leviton for repair If an equipment fault occurs do not attempt to repair the faulty component All maintenance activities should be performed by qualified personnel o...

Page 14: ...sed opened abused or altered in any manner or is not used under normal operating conditions or not in accordance with any labels or instructions There are no other or implied warranties of any kind including merchantability and fitness for a particular purpose but if any implied warranty is required by the applicable jurisdiction the duration of any such implied warranty including merchantability a...

Reviews: