
Page 3 of 10
STEP 3: Double Bolt Assembly
Install the threaded
post
of one (1) Double Bolt Assembly
[D]
into
each slotted plate located on the Bed Side Bar
[A]
using the highest
available slot with the handle pointing down. Secure the Double Bolt
Assembly using one (1) Ring Nut
[E]
, One (1) 3/8” Split Ring Washer
[G]
and one (1) 3/8” Washer
[F]
on each threaded post. [Fg. 4]
Moving back and forth between the plastic knob located on the
Double Bolt Assembly
[D]
and the Ring
Nut
[E]
, evenly tighten both points until the
rubber bumper at the end of the handle
comes in tight contact with the pickup bed sill
overhang
AND
the Ring Nut is fully tightened
against the slotted plates. [Fg. 5 & 6]
NOTE:
The plate on the Double Bolt
Assembly
[D]
is offset with the short end of
the plate facing up and the long end of the
plate facing down. [Fg. 7]
NOTE:
The Double Bolt Assembly
[D]
provides both vertical and
horizontal pressure to fully secure the carrier to the truck bed. If the
Double Bolt Assembly is not fully secured or seems loose in either
direction (horizontal/vertical) further adjustment/tightening is needed.
STEP 4: Cab Support Assembly
Thread the one Adjustment Bolt
[J]
through the Cab Support Bracket
[H]
and
then into the Cab Support Foot
[K]
as shown. [Fg. 8]
Complete this step for both Cab Support assemblies.
IMPORTANT:
The Adjustment Ring
[J]
must be inserted through the side of
the Cab Support Bracket that is angled down
[H]
.
NOTE:
For the remainder of this Manual this combination of parts will be
referred to as the Cab Support Assembly
[HKJ].
E
F
E
G F
[Fg. 4]
[Fg. 5]
[Fg. 6]
[Fg. 7]
[Fg. 8]
A
A
J
K
G
D
D
D
H
A
TRUCK
BED
SILL
SHORT
BUMPER
LONG
POST
KNOB
HKJ