INSTALLATION AND MAINTENANCE

 

X20 – 30 – 36  – AC GEARLESS

 

LEROY-SOMER

 

3141 en - 02.1999/ a

 

4.2 - Installation

 

Incorrect lifting methods may be dangerous for
personnel and may cause serious damage to the

machine.
Check that the machine weight is below the lifting capacity of
any sling or hook. The only way to properly lift the complete
machine is to attach it by points which are recommended (see
figure 1).

Motors should be installed in a location where cooling air
(which must be low in humidity, free of dust, steam and
corrosive gases) can enter and exit freely. Ensure that warm
air emissions cannot be drawn back in (motor against a wall
for example).

 

 

 

4.2.1 - Cleaning

 

- Release the brake by hand with the brake lever, or release
the brake springs and open the brake arms, and remove the
protection which is between the brake shoes and the brake
wheel of the traction sheave.
- Remove any rust-protective wax from the sheave.

Do not use any abrasive material, but rather a cloth
soaked in alcohol or solvent. Use a solvent wich does

not contain oil to avoid oil contamination of the friction
surfaces.

 

WARNING: only use the solvent in a ventilated area.

 

If the machines are delivered with a bed-plate and a
secondary sheave, the secondary sheave has to be cleaned
as well (see above).

 

4.2.2 - Mechanical installation

 

- The gearless machine must be installed on a bed plate not
subject to vibrations, and must be secured by four M30 bolts,
nuts, and washers. The bolts must be secured only when
ropes, car, counter-weight, traction sheave and secondary
sheave are perfectly aligned. When this operation is
completed, weld the plates attached to the U bolts of the
secondary sheave if it is supplied.
- Before installing the ropes, check that the traction sheave
can rotate freely by releasing the brake and rotating the
sheave by hand.
- When the ropes are installed, adjust the clearance between
the ropes and the rope guard and tighten the two bolts to
secure the rope guard.

 

4.3 - Connection

 

- See connection diagrams in the terminal boxes (motor,
brake and blower).
- Connect the motor using cables and connectors of an
appropriate size.
- Check also that connectors are crimped onto the cables.
Be particularly careful when screwing on the terminal nuts (if
done incorrectly, this could damage the connections by
overheating : see figure 2).
- During installation, include safety devices to protect the
motor.
- Connect the supply cables to the terminals U1, V1, W1 as
per IEC 34.1 to have clock-wise rotation of the shaft.
- If case, connect thermistors to the remote control.
- Connect the earth terminal.

 

4.4 - Bearing inspection

 

When the storage exceeds one year, it is advisable to
regrease (see section 5.2).

Lifting rings

X20

X30 - X36

Lifting rings

fig. 2

Incorrect

Correct

Summary of Contents for X20 AC GEARLESS

Page 1: ...This manual is to be given to the end user X20 30 36 AC GEARLESS Installation and maintenance 3141 en 02 1999 a...

Page 2: ...han 95 temperature between 16 and 40 C More stringent specifications can be accommodated by derating if the particular requirements are stated at the time of ordering 4 COMMISSIONING 4 1 Insulation in...

Page 3: ...e above 4 2 2 Mechanical installation The gearless machine must be installed on a bed plate not subject to vibrations and must be secured by four M30 bolts nuts and washers The bolts must be secured o...

Page 4: ...Reassemble the brake covers Once the adjustment is done connect the brake supply Release the mechanical system which immobilized the car before the adjustments 4 6 Filter Motors are fitted with filter...

Page 5: ...of the operation 5 2 4 Every five years Divertor sheave bearing maintenance Unscrew the two plugs G4 Replace one of them by a grease nipple Grease with 70 to 75 g of the original grease Put the two pl...

Page 6: ...er motor 41 2 Airgap adjustment screw 176 2 Plunger 42 2 Torque adjustment spring 177 2 Rubber 45 2 Adjustment nut 272 2 Microswitch 52 2 Brake lever 301 1 Rotor 55 2 Airgap adjustment counter nut 363...

Page 7: ...7 INSTALLATION AND MAINTENANCE X20 30 36 AC GEARLESS LEROY SOMER 3141 en 02 1999 a DRAWINGS Fig 5...

Page 8: ...8 INSTALLATION AND MAINTENANCE X20 30 36 AC GEARLESS LEROY SOMER 3141 en 02 1999 a Fig 6...

Page 9: ...9 INSTALLATION AND MAINTENANCE X20 30 36 AC GEARLESS LEROY SOMER 3141 en 02 1999 a...

Page 10: ...10 INSTALLATION AND MAINTENANCE X20 30 36 AC GEARLESS LEROY SOMER 3141 en 02 1999 a...

Page 11: ......

Page 12: ...LEROY SOMER 16015 ANGOUL ME CEDEX FRANCE RCS ANGOUL ME N B 671 820 223 S A au capital de 62 779 000 www leroy somer com...

Reviews: