9
Hardware Installation
Installation Steps
This section will explain how to install GINJ-0201-AT-24 series.
Caution:
This device is intended for use indoor and at altitudes up to 2000 meters.
Caution:
The device is intended to be installed in an industrial control enclosure and panel
Installation Steps
Step 1
Unpack the industrial PoE Injector from the original packing box.
Step 2
Check if the DIN-Rail bracket is screwed on the industrial PoE Injector.
If the DIN-Rail is not screwed on the industrial PoE Injector, please refer to the
DIN-Rail Mounting
section for DIN-Rail installation.
If you want to wall mount the industrial PoE Injector, please refer to the
Wall
Mounting
section for wall mounting installation.
Step 3
To hang the industrial PoE Injector on a DIN-Rail or wall, please refer to the
Mounting
Installation
section.
Step 4
Power on the industrial PoE Injector and then the power LED light will turn on.
If you need help on how to wire power, please refer to the
Wiring the Power Inputs
section.
Please refer to the
LED Indicators
section for LED light indication.
Step 5
Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.