Leonard MEGATRON 8N Installation Adjustment Service Download Page 6

TM-2020B LARGE VALVE PARTS

LOWER STEM & 

PACKING/O'RING

SWIVEL NUT

* 4707

SWIVEL

* 4704

4724 

4733 

4728

CAP WASHER

313 

O'RINGS (2)

YELLOW

SPRING

4742

CAP

4723 

UPPER STEM

4727 

(* IF APPLICABLE)

S ET  S CR EW

TM -36

C

H

T HE RMOS TA TIC

L E O N ARD

REMEMBER!

THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND

MAINTAINED ON A REGULAR BASIS (SEE MAINTENANCE GUIDE AND RECORD)

NOTE:

AFTER INSTALLING NEW PARTS IT WILL BE NECESSARY TO RESET THE

ADJUSTABLE HIGH TEMPERATURE LIMIT STOP ON EACH VALVE (SEE PAGE 2).

6

CHECKSTOP PARTS

REPAIR KITS

LOCK-TYPE

POINTER

O'RING**

UPPER STEM O'RING (4)

KIT R/200N * REBUILDING KIT

POINTER ROD

KIT 2/200Y * CHECKSTOP KIT

KIT 1/200Y * PACKINGS & GASKETS

THERMOSTAT

TGM-2/125

GROUP

SCREEN

4724 

TM-8

STEM O'RING (4)

LOWER STEM

& PACKING

COIL SLEEVE

4733 

2 EA:

STUD

SPRING

YELLOW

4742

TGM-1/200

PORT SLEEVE

313

ASSY.

4724

SCREEN

& PACKING

LOWER STEM

NUT ASSY.

PORT SLEEVE

**=2 EA.

4733

**

SPRING

POINTER ROD

MU-5A

O'RING (2)

TM-3/200

**

TM-28A

313

FLANGE

TM-21/125

YELLOW

4742

MU-5A

PKG.

CAP WASHER

4728

FLANGE

PKG.

TM-21/125

**

CAP WASHER

4728

**

30

ASSY

PORT SLEEVE NUT 

TM-3/200

FLANGE PACKING

COVER

SCREWS

TM-21/125

POINTER SCREW

W/WASHER

TM-29/29A

PLATE

DIAL

TM-16A

TM-16

PORT SLEEVE

TGM-1/200

ASSY 

POINTER ROD 

FRICTION
SPRING

STOP

TM-25D

TM-15B/200

SNAP CAP

57-L

TM-25C

POINTER

COVER 

THERMOSTAT GROUP 

STUD

COIL SLEEVE

TM-8

TM-28A

MU-5A

O'RING (2)  

TGM-2/125

DIAL

TM-16

PLATE

THERMOSTATIC

C

H

LEONARD

Summary of Contents for MEGATRON 8N

Page 1: ...system MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions Maximum Operating Pressure 125PSI 860 KPA for Hot and...

Page 2: ...less than shown see Flow Capacities page 12 If installed on a recirculated hot water system make certain the valve is piped according to Leonard s Required Piping Methods see page 4 REMEMBER THIS IS...

Page 3: ...lve V2R and shut ball valve V2L at the mixing valve 9 Set outlet temperature of the mixing valve LVR to the same temperature as step 7 10 Turn off enough fixtures for a flow of at least 2 GPM 7 6 l mi...

Page 4: ...8 3 8 ETC UNTIL DESIRED TEMPERATURE IS ACHIEVED REMEMBER THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS SEE MAINTENANCE GUIDE AND RECORD MGR 1000 4 SYSTEM FIXTURES HO...

Page 5: ...on corrosive cleaning solution DO NOT USE ABRASIVES Be certain thimble moves freely on port sleeve Note Driving ball on thimble must engage coil bracket in assembling 6 To disassemble bridge assembly...

Page 6: ...OINTER ROD KIT 2 200Y CHECKSTOP KIT KIT 1 200Y PACKINGS GASKETS THERMOSTAT TGM 2 125 GROUP SCREEN 4724 TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 POR...

Page 7: ...NANCE GUIDE AND RECORD NOTE AFTER INSTALLING NEW PARTS IT WILL BE NECESSARY TO RESET THE ADJUSTABLE HIGH TEMPERATURE LIMIT STOP ON EACH VALVE SEE PAGE 2 CHECKSTOP PARTS REPAIR KITS MU 4A RF MU 5A UPPE...

Page 8: ...ll be free from defects in material or workmanship under normal conditions of use when properly installed and maintained in accordance with Leonard s instructions for a period of one year from the dat...

Reviews: