Leonard MEGATRON 8N Installation Adjustment Service Download Page 3

SETUP INSTRUCTIONS

FOR BOTH 2020B-2P

1. The Parallel Unit MUST be piped according to a Leonard

Required Piping Method 5 (see page 4).

2. Make sure full hot and cold supplies to this assembly are

operating. The temperature of the hot water source must be
properly set and maintained.

3. The circulator (if used) must be turned OFF before setup.

4. Turn on enough fixtures for a flow of at least 30 GPM (114

l/min.) downstream from this system. Make sure each fixture
is set to deliver full "HOT" water.

5. Close outlet ball valves V1R,V2R, V1L.

6. Make sure ball valve V2L is in the full open position.

7. Set outlet temperature of the mixing valve LVL to the required

level.

8.

Open ball valve V2R and shut ball valve V2L at the mixing
valve.

9.

Set outlet temperature of the mixing valve LVR to the same
temperature as step 7.

10. Turn off enough fixtures for a flow of at least 2 GPM (7.6

l/min) downstream from this system. Make sure each fixture
is set to deliver full "HOT" water.

11. Open V1L, shut off ball valve V2R

12. Set outlet temperature of mixing valve SVL to the same

temperature as Step 7.

13. Open V1R and shut V1L, set outlet temperature of SVR

mixing valve to the same temperature as STEP 7.

14. Open all outlets. System is operational. To balance

circulation system temperature, see page 5 .

NOTE! FOR OPTIONAL OUTLET SETUP PIPING ARRANGEMENT, SEE PAGE 12

HOT

INLET

COLD

INLET

V2R

V1R

LVR

THERMOMETER

SVR

V2L

V1L

LVL

SVL

10

-10

2

0

0

4

0

14

0

°F

0

60

°C

50

LEONARD

20

40

R

30

1

2

0

1

0

0

60

80

LEONARD

THERMOSTATIC

C

H

ASSE
1017

LEONARD

THERMOSTATIC

C

H

ASSE
1017

3

Summary of Contents for MEGATRON 8N

Page 1: ...system MUST be piped according to LEONARD S REQUIRED PIPING METHOD 5 see page 4 6 Refer to page 3 of this bulletin for correct Setup Instructions Maximum Operating Pressure 125PSI 860 KPA for Hot and...

Page 2: ...less than shown see Flow Capacities page 12 If installed on a recirculated hot water system make certain the valve is piped according to Leonard s Required Piping Methods see page 4 REMEMBER THIS IS...

Page 3: ...lve V2R and shut ball valve V2L at the mixing valve 9 Set outlet temperature of the mixing valve LVR to the same temperature as step 7 10 Turn off enough fixtures for a flow of at least 2 GPM 7 6 l mi...

Page 4: ...8 3 8 ETC UNTIL DESIRED TEMPERATURE IS ACHIEVED REMEMBER THIS IS A CONTROL DEVICE WHICH MUST BE CLEANED AND MAINTAINED ON A REGULAR BASIS SEE MAINTENANCE GUIDE AND RECORD MGR 1000 4 SYSTEM FIXTURES HO...

Page 5: ...on corrosive cleaning solution DO NOT USE ABRASIVES Be certain thimble moves freely on port sleeve Note Driving ball on thimble must engage coil bracket in assembling 6 To disassemble bridge assembly...

Page 6: ...OINTER ROD KIT 2 200Y CHECKSTOP KIT KIT 1 200Y PACKINGS GASKETS THERMOSTAT TGM 2 125 GROUP SCREEN 4724 TM 8 STEM O RING 4 LOWER STEM PACKING COIL SLEEVE 4733 2 EA STUD SPRING YELLOW 4742 TGM 1 200 POR...

Page 7: ...NANCE GUIDE AND RECORD NOTE AFTER INSTALLING NEW PARTS IT WILL BE NECESSARY TO RESET THE ADJUSTABLE HIGH TEMPERATURE LIMIT STOP ON EACH VALVE SEE PAGE 2 CHECKSTOP PARTS REPAIR KITS MU 4A RF MU 5A UPPE...

Page 8: ...ll be free from defects in material or workmanship under normal conditions of use when properly installed and maintained in accordance with Leonard s instructions for a period of one year from the dat...

Reviews: