Integrated Lithium-ion Battery Pack For Telecom
User Manual
3 INSTALLATION GUIDE
All Right Reserved © LEOCH International Technology Limited
21
Table3-3
Electrical installation tools
The appearance of the tools, parameters, and names
Insulated gloves
Power cable crimpi
ng plier
Wire stripping pliers Electrical tape
Table3-4
Measuring Tools
The appearance of the tools, parameters, and names
Clamp the flow tab
le
-
-
3.3
Installation and wiring
Before installing, make sure that the switching power supply system is off and
that the battery's system switch is off.
The installation should ensure that the wiring platoon, bus and so on the dust has been
wiped clean, after installation to check, all connecting bolts are tightened. To designate a
person to check, the person responsible, to ensure that all bolts in the state of tightening.
If the installation is complete without connecting mains, disconnect the battery and
switching power supply. Before the official opening of the battery pack must be
supplemented, so as not to the future of the normal use of battery packs to bring great
harm hidden danger.
At least two or more people should be operated on the construction site.
3.3.1
Standard cabinet installation
Mounting fixed
The standard cabinet installation is to place the product on a pallet in a 19-inch
standard cabinet, push into the cabinet, with 6 m6*15 bolts through the product on
both sides of the chassis hanging ears on the 6 mounting holes, with square nuts to