Electrical installation
Supplementary protective equipotential bonding
EN
25
Lenze ¯ EDKVX00P242 ¯ 3.0
4.2
Supplementary protective equipotential bonding
Standardised, supplementary protective equipotential bonding is obtained by wiring in
compliance with the following items.
¯
A central earthing point is located on the metallic carrier in the connection area of
each device variant and is marked with
.
¯
Provide wiring to the central earthing point with a sufficient cross section in the
respective device variant.
–
Typically: 4 mm
2
¯
Provide wiring from the central earthing point to the terminal of the 24V supply
with an adequate cross section.
–
Typically: 1.5 mm
2
¯
If an optional HDMI extender is used, a pre−assembled cable for looping through
the supply voltage is included in the scope of supply.
¯
There is also a central earthing point in the EPCZEBT... switch boxes.
+
-
+
"
+
6
.
3
*
0
.
8
1
.
5
mm
²
(
AWG
16)
4
mm
²
(
AWG
10)
1
2
3
4
+
-
+
v
800
n
c
X
1
vx00GB_005
1
2
3
+
-
+
+
-
+
"
+
6
.
3
*
0
.
8
1
.
5
mm
²
(
AWG
16)
4
mm
²
(
AWG
10)
v
200
X
1
vx00GB_005
"
+
6
.
3
*
0
.
8
+
HDBaseT
Extender Kit
1
1
2
2
3
3
+
+
-
-
+
+
v
200
1
2
3
+
-
+
+
-
+
1
.
5
mm
²
(
AWG
16)
4
mm
²
(
AWG
10)
X
1
X
11
X
12
vx00GB_005
Summary of Contents for v200-P
Page 27: ......