Commissioning
Commissioning for ECS series standard devices
EDKMF2102 DE/EN/FR 8.0
81
inbetriebnahmeECS
Detailed
information
Procedure
Step
4.
Make other necessary controller settings.
Commissioning of the controller
Documentation
for the respective
controller
l
For initial commissioning set code
C0005
= 1003 (signal
configuration: speed control via AIF).
l
Enable the controller.
– Terminals SI1 (controller enable) and SI2 (pulse inhibit) are
always active and have to be HIGH during operation.
Otherwise the controller will be inhibited.
Note
The controller must always be externally supplied with 24 V DC.