
Mechanical installation
Attaching operating unit
3
49
EDBPM−H310 DE/EN/FR 7.1
3
Mechanical installation
3.1
Attaching operating unit
The dimensions for the mounting cutout can be found in the "Technical data"
(
How to mount the operating unit:
0
1
h310_006
1. Insert operating unit
with seal
into the mounting cut−out.
0 V
DC
N.C
.
LCD
ADJ
+24
VDC
INPUT
: 1
8 -
32
V
5W
FUSE
315
mA
ASP8
N.C.
CAN+
Shield
CAN-
V-
1
2
3
4
5
2
1
3
4
2
2
h310_011
2. Insert mounting clamps
into the slots at the operating unit.