Technical data
Overcurrent operation
l
42
EDS700ACBA EN 5.1
4.3
Overcurrent operation
Power supply modules and axis modules can be operated with currents exceeding the
rated current if the time interval of this overcurrent operation is limited. Within the
utilisation cycles, an overcurrent is possible for a certain time if afterwards an accordingly
long recovery phase takes place. Two utilisation cycles with a duration of 15 s and 180 s are
defined.
ƒ
15−s cycle
– 3 s load period with peak current
0
(200 %)
– 12 s recovery time with limited current
1
(75 %)
ƒ
180−s cycle
– 60 s load period with peak current
2
(150 %)
– 120 s recovery time with limited current
3
(75 %)
A load period must be followed by a recovery time. During the recovery time the current
must not exceed the value given.
The values given refer to the rated output current.
ƒ
I
rdc
for power supply modules
ƒ
I
ar4
for axis modules
Summary of Contents for E70AC Series
Page 1: ...EDS700ACBA Usx Usx Hardware Manual i700 l E70AC Servo Inverter i700 Translation...
Page 2: ...0Fig 0Tab 0...
Page 75: ...Mechanical installation 5 l 75 EDS700ACBA EN 5 1...
Page 147: ...Accessories overview Terminals 11 l 147 EDS700ACBA EN 5 1 E70AZEVK001 i700ZM001 A...
Page 148: ...Accessories overview Terminals 11 l 148 EDS700ACBA EN 5 1 E70AZEVK002 i700ZM001 C...
Page 149: ...Accessories overview Terminals 11 l 149 EDS700ACBA EN 5 1 E70AZEVK003 i700ZM001 B...
Page 150: ...Accessories overview Terminals 11 l 150 EDS700ACBA EN 5 1 E70AZEVK004 i700ZM001 D...
Page 151: ...Accessories overview Terminals 11 l 151 EDS700ACBA EN 5 1 E70AZEVK005 i700ZP005 a...
Page 152: ...Accessories overview Terminals 11 l 152 EDS700ACBA EN 5 1 E70AZEVK006 i700ZP005 b...
Page 161: ......