22
NE1032T Installation Guide
RJ-45 Management Port
The
RJ
‐
45
management
port
on
the
front
panel
supports
10/100/1000BASE
‐
T,
in
‐
line
switch
management.
To
attach
an
RJ
‐
45
connector
to
the
switch,
push
the
RJ
‐
45
cable
connector
into
the
port
connector
until
it
clicks
into
place.
To
disconnect
the
RJ
‐
45
cable,
squeeze
the
release
tab
and
gently
pull
the
cable
connector
out
of
the
switch
connector.
RJ-45 Management LEDs
The
RJ
‐
45
management
port
LEDs
are
oriented
as
shown
in
the
following
figure.
Figure 5.
RJ
‐
45
management
port
LEDs
Status
LEDs
for
the
RJ
‐
45
management
port
are
described
in
the
following
table.
Table 3.
RJ-45 status LEDs behavior
LED
State
Functional Meaning
Link
Flashing
green
Activity
Steady
green
Link
up
Off
No
link
Speed
Flashing
green
Activity
Steady
green
100/1000
Mbps
connection
Off
No
activity
or
10
Mbps
connection
Speed LED
Link LED
Summary of Contents for ThinkSystem NE1032T
Page 1: ...Lenovo ThinkSystem NE1032T RackSwitch Installation Guide For Lenovo Cloud Network OS ...
Page 6: ...6 Lenovo G8296 Installation Guide ...
Page 14: ...14 NE1032T Installation Guide ...
Page 18: ...18 NE1032T Installation Guide ...
Page 32: ...32 NE1032T Installation Guide ...
Page 78: ...78 NE1032T Installation Guide ...
Page 94: ...94 NE1032T Installation Guide ...
Page 100: ...100 NE1032T Installation Guide ...
Page 120: ...120 NE1032T Installation Guide ...