Figure 142. TCM/TPM adapter removal
Step 1. Press and hold the release latch.
Step 2. Lift the TCM/TPM adapter straight up.
Notes:
• Carefully handle the TCM/TPM adapter by its edges.
• Your TCM/TPM adapter might look slightly different from the illustration.
If you are instructed to return the old TCM/TPM adapter, follow all packaging instructions and use any
packaging materials that are provided.
Install the TCM/TPM adapter (for Chinese Mainland only)
Use this information to install the TCM/TPM adapter.
Before installing the TCM/TPM adapter, touch the static-protective package that contains the new TCM/TPM
adapter to any unpainted surface on the outside of the server. Then, take the new TCM/TPM adapter out of
the package and place it on a static-protective surface.
To install the TCM/TPM adapter, locate the TCM/TPM connector on the system board, and complete the
following step:
236
User Guide for ThinkAgile VX7820 Appliance, ThinkAgile VX 4-Socket 4U Certified Node
Summary of Contents for ThinkAgile VX 4-Socket 4U Certified Node
Page 6: ...iv User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 10: ...viii User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 69: ...Chapter 2 Server components 59 ...
Page 76: ...66 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 96: ...86 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 252: ...242 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 276: ...266 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 284: ...274 User Guide for ThinkAgile VX7820 Appliance ThinkAgile VX 4 Socket 4U Certified Node ...
Page 295: ......
Page 296: ......