Step 6. Secure the rear mounting bracket of the rail with two M5 screws.
Step 7. Extend the rail until the front mounting bracket of the rail reaches the front rack.
Step 8. Repeat steps
through
to install the front rail mounting bracket to the front mounting flange.
Attention:
• For the front mounting bracket, the screws for square hole rack need to be fastened in the same
holes as the preinstalled screws for round hole rack. Otherwise, the storage enclosure cannot be
secured to the front mounting bracket.
• After fastening the two screws for square hole rack, do not further secure the front mounting
bracket of the rail with screws until you install the storage enclosure into the rack.
Step 9. Repeat steps
through
to install the opposite rail in the rack.
The installation of the storage block slide rails in a square hole rack is now complete.
The next step is to install the storage enclosure: Install the storage enclosure
42
Lenovo ThinkAgile CP Storage Capacity Upgrade Guide
Summary of Contents for ThinkAgile CP 4000 Series
Page 1: ...Lenovo ThinkAgile CP Storage Capacity Upgrade Guide Models CP4000 CP6000 ...
Page 4: ...ii Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 6: ...iv Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 8: ...vi Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 26: ...18 Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 54: ...46 Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 64: ...56 Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 66: ...58 Lenovo ThinkAgile CP Storage Capacity Upgrade Guide ...
Page 67: ......
Page 68: ......