1.
Remove the two bezel sections.
2.
Connect the battery
module (never pull on the
wires).
3.
Attach the left-hand side
of the front panel by sliding it,
then by locking the push
button.
4.
Attach the center panel by
inserting the tabs on the left
side into the slots and rotating
it closed.
Rack installation
About this task
The UPS and connected EBMs must be installed no higher than 5 feet (1.5m) above
the floor to allow for easy installation and servicing.
Procedure
For mounting on rails, follow steps 1 to 4 in the illustration.
Note:
The rails and necessary hardware are supplied by Lenovo.
Chapter 3. Installation
21
Summary of Contents for RT1.5kVA
Page 1: ...2U Rack or Tower UPS RT1 5kVA RT2 2kVA and RT3 0kVA Installation and User s Guide ...
Page 2: ......
Page 3: ...2U Rack or Tower UPS RT1 5kVA RT2 2kVA and RT3 0kVA Installation and User s Guide ...
Page 6: ...iv Installation and User s Guide ...
Page 20: ...4 Installation and User s Guide ...
Page 34: ...18 Installation and User s Guide ...
Page 52: ...36 Installation and User s Guide ...
Page 56: ...40 Installation and User s Guide ...
Page 60: ...44 Installation and User s Guide ...
Page 72: ...56 Installation and User s Guide ...
Page 74: ...58 Installation and User s Guide ...
Page 75: ......
Page 76: ...Part Number 00WA359 Printed in USA 1P P N 00WA359 ...