Figure 8. Installing the rail spring
Step 3.
Working at the front of the rack cabinet, identify the two standard rack units (2U) of space in the
rack into which you want to install the support rails.
Figure 9 “Hole locations in the front of the rack” on page 13 shows two rack units with the front
mounting holes identified.
12
Lenovo Storage V7000 Quick Installation Guide