2. Install the server into the rack if necessary.
3. Reconnect power cords and all external cables.
Power supply unit replacement
Use this procedure to install or remove the fixed power supply unit.
Remove the fixed power supply unit
Use this information to remove the fixed power supply unit.
To avoid possible danger, read and follow the following safety information.
S001
DANGER
Electrical current from power, telephone, and communication cables is hazardous.
To avoid a shock hazard:
• Connect all power cords to a properly wired and grounded electrical outlet/source.
• Connect any equipment that will be attached to this product to properly wired outlets/sources.
• When possible, use one hand only to connect or disconnect signal cables.
• Never turn on any equipment when there is evidence of fire, water, or structural damage.
• The device might have more than one power cord, to remove all electrical current from the
device, ensure that all power cords are disconnected from the power source.
S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off the
electrical current supplied to the device. The device also might have more than one power cord. To
remove all electrical current from the device, ensure that all power cords are disconnected from the
power source.
S035
CAUTION:
.
Hardware replacement procedures
65
Summary of Contents for 7Y54
Page 1: ...ThinkSystem SR150 Maintenance Manual Machine Type 7Y54 ...
Page 8: ...vi ThinkSystem SR150 Maintenance Manual ...
Page 25: ...Chapter 2 Server components 17 ...
Page 38: ...30 ThinkSystem SR150 Maintenance Manual ...
Page 102: ...94 ThinkSystem SR150 Maintenance Manual ...
Page 128: ...120 ThinkSystem SR150 Maintenance Manual ...
Page 132: ...124 ThinkSystem SR150 Maintenance Manual ...
Page 137: ......
Page 138: ...Part Number SP47A31793 Printed in Chinese Mainland 1P P N SP47A31793 1PSP47A31793 ...