GUIDE SPECIFICATIONS
TS 6 to 12.5 Ton R−410A Air Conditioners
/ Page 30
B.
Product Data: Submit product data for specified products.
C.
Shop Drawings:
1.
Submit shop drawings in accordance with Section [01330 − Submittal Procedures].
2.
Indicate:
a.Equipment, piping and connections, together with valves, strainers, control assemblies,
thermostatic controls, auxiliaries and hardware and recommended ancillaries which are
mounted, wired and piped ready for final connection to building system, its size and
recommended bypass connections.
b.Piping, valves and fittings shipped loose showing final location in assembly.
c. Control equipment shipped loose, showing final location in assembly.
d.Field wiring diagrams.
e.Dimensions, internal and external construction details, installation clearances, recommended
method of installation, sizes and location of mounting bolt holes.
f. Detailed composite wiring diagrams for control systems showing factory installed wiring and
equipment on packaged equipment or required for controlling devices or ancillaries,
accessories, controllers.
D.
Quality Assurance:
1.
All units to be factory tested before shipping.
2.
Manufacturer’s Instructions: Manufacturer’s installation instructions.
Specifier Note: Coordinate paragraph below with Part 3 Field Quality Requirements Article herein. Retain or
delete as applicable.
E.
Closeout Submittals: Submit the following:
1.
Warranty: Warranty documents specified herein.
2.
Operation and Maintenance Data: Operation and maintenance data for installed products in
accordance with Division 1 Closeout Submittals (Maintenance Data and Operation Data) Section.
Include methods for maintaining installed products and precautions against cleaning materials and
methods detrimental to finishes and performance. Include names and addresses of spare part
suppliers.
3.
Provide brief description of unit, with details of function, operation, control and component service.
4.
Commissioning Report: Submit commissioning reports, report forms and schematics in accordance
with Section 01810 − Commissioning.
1.05 QUALITY ASSURANCE
A.
Qualifications:
1.
Installer experienced in performing work of this section who has specialized in installation of work
similar to that required for this project.
2.
Manufacturer Qualifications: Manufacturer capable of providing field service representation during
construction and approving application method.
B.
Preinstallation Meetings: Conduct pre−installation meeting to verify project requirements, manufacturer’s
installation instructions and manufacturer’s warranty requirements. Comply with Division 1 Project
Management and Coordination (Project Meetings).
1.06 DELIVERY, STORAGE & HANDLING
A.
General: Comply with Division 1 Product Requirements.
B.
Ordering: Comply with manufacturer’s ordering instructions and lead time requirements to avoid construction
delays.
C.
Packing, Shipping, Handling and Delivery:
1.
Deliver materials in manufacturer’s original, unopened, undamaged containers with identification
labels intact.
2.
Ship, handle and unload units according to manufacturer’s instructions.
D.
Storage and Protection:
1.
Store materials protected from exposure to harmful weather conditions.
2.
Factory shipping covers to remain in place until installation.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 1 Closeout
Submittals (Warranty).
1.07 WARRANTY
A.
Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
B.
Manufacturer’s Warranty: Submit, for Owner’s acceptance, manufacturer’s standard warranty document
executed by authorized company official. Manufacturer’s warranty is in addition to, and not a limitation of,
other rights Owner may have under Contract Documents.