Page 6
• The furnace heat exchanger, components, duct sys-
tem, air filters and evaporator coils must be thoroughly
cleaned following final construction clean-up.
• All furnace operating conditions (including ignition, in-
put rate, temperature rise and venting) must be verified
according to these installation instructions.
General
WARNING
This prodcut contains a chemical known to the State
of California to cause cancer, birth defects, or other
reproductive harm.
CAUTION
SLP98UHV unit should not be installed in areas normally
subject to freezing temperatures..
These instructions are intended as a general guide and do
not supersede local codes in any way. Consult authorities
having jurisdiction before installation.
In addition to the requirements outlined previously, the fol-
lowing general recommendations must be considered
when installing a SLP98UHV furnace:
• Place the furnace as close to the center of the air distri-
bution system as possible. The furnace should also be
located close to the chimney or vent termination point
• When the furnace is installed in an attic or other insulat-
ed space, keep insulation away from the furnace.
• When the furnace is installed in an unconditioned
space, consider provisions required to prevent freezing
of condensate drain system.
• Please consult the manufacturer of your evaporator
coil for their recommendations on distance required
between the heat exchanger and their drain pan. Ad-
equate space must be provided between the drain pan
and the furnace heat exchanger.
Installation - Setting Equipment
WARNING
Do not connect the return air ducts to the back of the
furnace. Doing so will adversely affect the operation of
the safety control devices, which could result in personal
injury or death.
WARNING
Do not install the furnace on its front or back.
See figure 4.
See figure 4.
Front
Back
FIGURE 4
Upflow Applications
The SLP98UHV gas furnace can be installed as shipped
in the upflow position. Refer to figure 10 for clearances.
Select a location that allows for the required clearances
that are listed on the unit nameplate. Also consider gas
supply connections, electrical supply, vent connection,
condensate trap and drain connections, and installation
and service clearances [24 inches (610 mm) at unit front].
The unit must be level from side to side. Unit may be posi
-
tioned from level to 1/2” toward the front to aid in draining.
See figure 5
..